Tuesday 18 August 2009

Cables, trenches and mud

Much of the weekend was spent doing cabling work. Drying out the conduit which had filled up during the rains, feeding cables through, and sealing the ends. Some of the trenches are filled in but I'm afraid there is still a lot of work to be done as the backyard is still a huge mess.

No comments: